Erlaubnis für Großraum- und Schwerverkehr Erteilung
Inhalt
<div lang="en-x-mtfrom-de">Permission for large-capacity and heavy traffic granted</div>
<div lang="en-x-mtfrom-de">Apply for permission for large-volume and heavy traffic</div>
Begriffe im Kontext
<div lang="en-x-mtfrom-de">VEMAGS</div> (Synonym), <div lang="en-x-mtfrom-de">Heavy transport, special permit</div> (Synonym), <div lang="en-x-mtfrom-de">Large-capacity transports, exemption</div> (Synonym), <div lang="en-x-mtfrom-de">Heavy transport</div> (Synonym), <div lang="en-x-mtfrom-de">Large-capacity transport</div> (Synonym)
Fachlich freigegeben am
14.12.2021
Fachlich freigegeben durch
nicht vorhanden
Section 29 paragraph 3 of the Road Traffic Licensing Regulations (StVZO)
https://www.gesetze-im-internet.de/stvzo_2012/__29.html
§ 32 Road Traffic Licensing Regulations (StVZO)
https://www.gesetze-im-internet.de/stvzo_2012/__32.html
§ 34 Road Traffic Licensing Regulations (StVZO)
https://www.gesetze-im-internet.de/stvzo_2012/__34.html
Section 46 paragraph 1 number 5 of the Road Traffic Regulations (StVO)
https://www.gesetze-im-internet.de/stvo_2013/__46.html
Fee schedule for measures in road traffic (GebOSt)
www.gesetze-im-internet.de/stgebo_2011/BJNR009800011.html
https://www.gesetze-im-internet.de/stvzo_2012/__29.html
§ 32 Road Traffic Licensing Regulations (StVZO)
https://www.gesetze-im-internet.de/stvzo_2012/__32.html
§ 34 Road Traffic Licensing Regulations (StVZO)
https://www.gesetze-im-internet.de/stvzo_2012/__34.html
Section 46 paragraph 1 number 5 of the Road Traffic Regulations (StVO)
https://www.gesetze-im-internet.de/stvo_2013/__46.html
Fee schedule for measures in road traffic (GebOSt)
www.gesetze-im-internet.de/stgebo_2011/BJNR009800011.html
If you want to transport a load with a particularly large vehicle on public roads, or if the load exceeds legal dimensions, you need a permit.
Large-volume transport and heavy transport are vehicles or their loads that exceed the legally prescribed dimensions and weights.
You must apply for a permit and/or an exemption to operate vehicles and trains on public roads if
You must apply for a permit and/or an exemption to operate vehicles and trains on public roads if
- the charge,
- the dimensions,
- the axle load or
- the total weight
- Description of the exact route
- Information on dimensions, axle load and total weight
- written disclaimer
- If necessary: special permit according to Section 70 of the Road Traffic Licensing Regulations (StVZO), if not only the load deviates from the permissible dimensions, but also a special vehicle is used which does not comply with the Road Traffic Licensing Regulations (StVZO) even when unloaded
- Transport by rail or water is not an option for your shipment.
- Suitable roads are available for your transport.
- Your load cannot be divided into several transports. Special conditions apply if there are multiple parts.
The fees for large-volume and heavy transport depend on the type and volume of the transport. The VEMAGS fee calculator helps you determine the fees that will probably be charged for the permit and approval notice. Please note the link included under "Links".
If you would like to apply online:
- You submit the application and all required documents via the online portal.
- If necessary, the authority may interview you for further information.
- The responsible authority will examine your application and decide whether you can be granted permission or approval.
- After the examination has been completed, you will receive the permit or approval or rejection as well as the fee notice via the online portal. In some cases, the permit or approval may be granted subject to conditions.
- You submit your written application together with the necessary documents to the responsible authority
- If necessary, the authority may interview you for further information.
- The responsible authority will examine your application and decide whether you can be granted permission or approval.
- After the examination has been completed, you will receive the permission or approval or rejection as well as the fee notice in writing. In some cases, the permission or approval may be granted subject to conditions.
2 weeks
The processing time stated only applies without a hearing. Longer processing times are to be expected in the case of static recalculations of bridge structures, complex hearing procedures and requests from other federal states.
The processing time stated only applies without a hearing. Longer processing times are to be expected in the case of static recalculations of bridge structures, complex hearing procedures and requests from other federal states.
- Apply for permission for large-volume and heavy traffic
- Large-volume and heavy transports exceed legal dimensions and weights.
- Permit/special permit required for traffic on public roads.
- Application necessary if load, dimensions, axle load or total weight exceed the legal limits.
- Permission/special permit required before starting the journey