Dies ist die interne Entwicklungsumgebung des FIM Portals. Bitte nutzen Sie die produktive Umgebung.

Erlaubnis für Großraum- und Schwerverkehr Erteilung

Hamburg 99036003001000 Typ 2/3

Inhalt

Leistungsschlüssel

99036003001000

Leistungsbezeichnung

<div lang="en-x-mtfrom-de">Permission for large-capacity and heavy traffic granted</div>

Leistungsbezeichnung II

<div lang="en-x-mtfrom-de">Apply for permission for large-volume and heavy traffic</div>

Leistungstypisierung

Typ 2/3

Begriffe im Kontext

<div lang="en-x-mtfrom-de">VEMAGS</div> (Synonym), <div lang="en-x-mtfrom-de">Heavy transport, special permit</div> (Synonym), <div lang="en-x-mtfrom-de">Large-capacity transports, exemption</div> (Synonym), <div lang="en-x-mtfrom-de">Heavy transport</div> (Synonym), <div lang="en-x-mtfrom-de">Large-capacity transport</div> (Synonym)

Leistungstyp

nicht vorhanden

SDG Informationsbereiche

nicht vorhanden

Lagen Portalverbund

nicht vorhanden

Einheitlicher Ansprechpartner

Nein

Fachlich freigegeben am

14.12.2021

Fachlich freigegeben durch

nicht vorhanden

Handlungsgrundlage

Section 29 paragraph 3 of the Road Traffic Licensing Regulations (StVZO)
https://www.gesetze-im-internet.de/stvzo_2012/__29.html
§ 32 Road Traffic Licensing Regulations (StVZO)
https://www.gesetze-im-internet.de/stvzo_2012/__32.html
§ 34 Road Traffic Licensing Regulations (StVZO)
https://www.gesetze-im-internet.de/stvzo_2012/__34.html
Section 46 paragraph 1 number 5 of the Road Traffic Regulations (StVO)
https://www.gesetze-im-internet.de/stvo_2013/__46.html
Fee schedule for measures in road traffic (GebOSt)
www.gesetze-im-internet.de/stgebo_2011/BJNR009800011.html

Teaser

If you want to transport a load with a particularly large vehicle on public roads, or if the load exceeds legal dimensions, you need a permit.

Volltext

Large-volume transport and heavy transport are vehicles or their loads that exceed the legally prescribed dimensions and weights.

You must apply for a permit and/or an exemption to operate vehicles and trains on public roads if
  • the charge,
  • the dimensions,
  • the axle load or
  • the total weight
exceed the legally permitted limits. You must have the permit and/or special authorization before you start your journey.

Erforderliche Unterlagen

  • Description of the exact route
  • Information on dimensions, axle load and total weight
  • written disclaimer
  • If necessary: special permit according to Section 70 of the Road Traffic Licensing Regulations (StVZO), if not only the load deviates from the permissible dimensions, but also a special vehicle is used which does not comply with the Road Traffic Licensing Regulations (StVZO) even when unloaded
Depending on the application, additional documents may be required. You can find out more from the responsible road traffic authority or by completing the online application.

Voraussetzungen

  • Transport by rail or water is not an option for your shipment.
  • Suitable roads are available for your transport.
  • Your load cannot be divided into several transports. Special conditions apply if there are multiple parts.

Kosten

The fees for large-volume and heavy transport depend on the type and volume of the transport. The VEMAGS fee calculator helps you determine the fees that will probably be charged for the permit and approval notice. Please note the link included under "Links".

Verfahrensablauf

If you would like to apply online:
  • You submit the application and all required documents via the online portal.
  • If necessary, the authority may interview you for further information.
  • The responsible authority will examine your application and decide whether you can be granted permission or approval.
  • After the examination has been completed, you will receive the permit or approval or rejection as well as the fee notice via the online portal. In some cases, the permit or approval may be granted subject to conditions.
If you wish to submit the application in writing:
  • You submit your written application together with the necessary documents to the responsible authority
  • If necessary, the authority may interview you for further information.
  • The responsible authority will examine your application and decide whether you can be granted permission or approval.
  • After the examination has been completed, you will receive the permission or approval or rejection as well as the fee notice in writing. In some cases, the permission or approval may be granted subject to conditions.

Bearbeitungsdauer

2 weeks

The processing time stated only applies without a hearing. Longer processing times are to be expected in the case of static recalculations of bridge structures, complex hearing procedures and requests from other federal states.

Frist

2 weeks

Hinweise

No

Rechtsbehelf

Action before the administrative court

Kurztext

  • Apply for permission for large-volume and heavy traffic
  • Large-volume and heavy transports exceed legal dimensions and weights.
  • Permit/special permit required for traffic on public roads.
  • Application necessary if load, dimensions, axle load or total weight exceed the legal limits.
  • Permission/special permit required before starting the journey

Ansprechpunkt

nicht vorhanden

Zuständige Stelle

Department of Home Affairs and Sport

Formulare

nicht vorhanden