Nutzungsaufnahme einer baugenehmigungsbedürftigen oder baugenehmigungsfrei gestellten Anlage anzeigen
Inhalt
Begriffe im Kontext
- Kauf und Verkauf von Immobilien, einschließlich aller Bedingungen und Pflichten im Zusammenhang mit der Besteuerung, dem Eigentum oder der Nutzung von Immobilien (auch als Zweitwohnsitz)
Fachlich freigegeben am
Fachlich freigegeben durch
If you, as the building owner, wish to use a structural facility that requires a permit or is exempt from approval, you must notify the lower building supervisory authority at least two weeks in advance.
If you, as the building owner, wish to use a structural facility that requires a permit or is exempt from the requirement for a permit, you must notify the lower building supervisory authority at least two weeks in advance.
In the case of buildings in building class 4, with the exception of special buildings and medium-sized and large garages, you must also submit the "Confirmation that the construction complies with the fire protection certificate" together with the notification of the commencement of use.
- Notification of the commencement of use
- Confirmation that the construction complies with the fire protection certificate (only for buildings of building class 4, except for special buildings as well as medium-sized and large garages)
- Fire protection certificate (if not tested by the building authorities; only for buildings of building class 4, except special buildings as well as medium-sized and large garages with periodic testing by the building authorities)
Check to see if a Notice of Occupancy is required for your structural facilities. If a notice of commencement of use is required:
- Compile the necessary information and evidence.
- Send the notification to the responsible lower building supervisory authority.
Fireplaces may not be put into operation until the authorized district chimney sweep has certified the suitability and safe usability of the exhaust systems.
Ask your design engineer (usually an architect or civil engineer) which certificates are required for your specific project.
- Show imminent use of the building
- at the latest 2 weeks before commencement of use
- The notification is only necessary if the building project requires a permit or is exempt from approval.
- Responsible: Lower building supervisory authority
- Forms available: no
- Online service available: yes
- Written form required: no
- Informal application possible: yes
- Personal appearance required: no