Dies ist die interne Entwicklungsumgebung des FIM Portals. Bitte nutzen Sie die produktive Umgebung.

Antrag auf Erlaubnis und Herstellung einer Überfahrt / Bremerhaven

Bremen 99108015000000 Typ 4

Inhalt

Leistungsschlüssel

99108015000000

Leistungsbezeichnung

nicht vorhanden

Leistungsbezeichnung II

Application for permission and production of a crossing / Bremerhaven

Leistungstypisierung

Typ 4

Begriffe im Kontext

nicht vorhanden

Leistungstyp

nicht vorhanden

SDG Informationsbereiche

nicht vorhanden

Lagen Portalverbund

  • Bauplanung (2050400)

Einheitlicher Ansprechpartner

nicht vorhanden

Fachlich freigegeben am

29.02.2024

Fachlich freigegeben durch

nicht vorhanden

Handlungsgrundlage

nicht vorhanden

Teaser

Do you need a permit from the road authority to use a road surface, such as footpaths, cycle paths or green spaces with a vehicle on a crossing? You can apply for this permission at the Office of Road and Bridge Construction.

Volltext

In accordance with § 17 of the Bremen State Roads Act (BremLStrG), road surfaces that are not intended to accommodate general motor vehicle traffic, such as footpaths and cycle paths or green spaces, may only be used by vehicles as crossings with the permission of the road authorities.

Erforderliche Unterlagen

No documents required.

Voraussetzungen

The owner, heritable building right holder or usufructuary of a property bordering on the road is entitled to apply. If the property does not border the street and is connected to it exclusively by a drivable access secured under public law via an adjoining property, the owner, heritable building right holder or usufructuary of the rear property is also entitled to apply. For details on the requirements, please refer to the attached information sheet on the construction of a driveway.

Kosten

Gebühr: 217€
The costs of establishing the crossing shall be borne by the applicant. In addition, an overhead surcharge amounting to 10% of the net sum of the production costs is levied for the personnel costs incurred (Bremisches Landesstraßengesetz).

Verfahrensablauf

The crossing will be constructed and maintained by the road construction authority. The applicant has the option of designating an approved road construction company to perform the work in compliance with the requirements issued by the Road and Bridge Department. It is requested that the form Application for Permit and Construction of a Crossing be used and submitted along with a site plan approximately 2 months prior to the intended use. For details on the process, please refer to the attached Information Sheet on Making a Crossing. Alternatively, the online service "Apply for a property crossing in Bremerhaven" can also be used.

Bearbeitungsdauer

nicht vorhanden

Frist

nicht vorhanden

Weiterführende Informationen

nicht vorhanden

Hinweise

nicht vorhanden

Rechtsbehelf

nicht vorhanden

Kurztext

nicht vorhanden

Ansprechpunkt

nicht vorhanden

Zuständige Stelle

nicht vorhanden

Ursprungsportal