Dies ist die interne Entwicklungsumgebung des FIM Portals. Bitte nutzen Sie die produktive Umgebung.

Gehwegüberfahrten Änderung

Hamburg 99108015011000 Typ 4b

Inhalt

Leistungsschlüssel

99108015011000

Leistungsbezeichnung

<div lang="en-x-mtfrom-de">Sidewalk crossings change</div>

Leistungsbezeichnung II

<div lang="en-x-mtfrom-de">Request a sidewalk crossing change</div>

Leistungstypisierung

Typ 4b

Begriffe im Kontext

<div lang="en-x-mtfrom-de">Curb</div> (Synonym), <div lang="en-x-mtfrom-de">Subsidence</div> (Synonym), <div lang="en-x-mtfrom-de">curb lowering</div> (Synonym), <div lang="en-x-mtfrom-de">sidewalk</div> (Synonym), <div lang="en-x-mtfrom-de">sidewalk lowering</div> (Synonym), <div lang="en-x-mtfrom-de">sidewalk crossing</div> (Synonym), <div lang="en-x-mtfrom-de">property development</div> (Synonym), <div lang="en-x-mtfrom-de">driveway</div> (Synonym), <div lang="en-x-mtfrom-de">driveway</div> (Synonym)

Leistungstyp

nicht vorhanden

SDG Informationsbereiche

nicht vorhanden

Lagen Portalverbund

nicht vorhanden

Einheitlicher Ansprechpartner

Nein

Fachlich freigegeben am

09.06.2022

Fachlich freigegeben durch

nicht vorhanden

Teaser

The sidewalk crossing, also known as a property access road or curb reduction, is used to enable vehicles to easily access a property from the street. Existing sidewalk crossings can be changed.

Volltext

Sidewalk crossings, also known as property access roads or curb cuts, are used to enable vehicles to easily reach a property from the street. If you are planning a project that requires curb lowering, you will need a curb crossing permit. Existing sidewalk crossings can also be modified. You can request a sidewalk crossing change. Property driveways, whether in construction or alteration, require a different finish or attachment than the sidewalk and must be approved by the proper authority. As a rule, the work in the public street space is commissioned by the city. In exceptional cases, you as the applicant may commission the work yourself from an approved specialist company.

Erforderliche Unterlagen

  • main request
    • In written form
  • proof
    • True-to-scale site plan
    • Excerpt from the real estate cadastre
    • Photos of the location
    • Land map (optional)

Voraussetzungen

  • You are the owner of the property.
  • Alternatively, you have a power of attorney from the property owner.
  • If you are allowed to take over the production yourself, the commissioned company must be an approved company.
  • The walkway remains consistent in terms of height and appearance.
  • There are no interruptions to the sidewalk as a result of the measure

Kosten

Cost type: variable
Cost (variable): from _50__ up to _800__ euros
Description of the costs: administration fee
Note: The costs are divided into fees and production costs. The fee and the production costs depend on the size and condition of the pavement crossing (possibly also for a replacement tree planting or light pole conversion). Both cost components must be borne by the applicant.

Verfahrensablauf

You can apply in writing (by post, email, fax) to change the sidewalk crossing. The sidewalk crossing is changed either by the competent authority or by an approved company. The following procedure must be observed before the change is made:
  • You apply for the change of the pavement crossing with all the necessary documents at the responsible office.
  • As soon as the application is submitted, it is checked whether there are any reasons against making the change.
  • In the case of more extensive measures, you must organize and carry out an on-site appointment in advance together with the responsible authority.
  • After your application has been checked positively, you will receive a notification of approval and can have the sidewalk crossing changed (subject to possible conditions and requirements).
  • You must make an advance payment based on the production costs.
  • After completion of the work, you will receive an invoice for the payment of the remaining production costs, less the advance payment made.
If the responsible authority changes the sidewalk crossing:
  • You do not have to take any further steps to continue the work.
If the pavement crossing is changed by an approved company:
  • The commissioned company must apply for a transport authority order for the measure.
  • After completion of the construction work, you agree on a joint acceptance date with the responsible authority.

Bearbeitungsdauer

  • The processing time differs between application processing and changing the sidewalk crossing.
  • Application processing: usually prompt
  • The change of the sidewalk crossing by the competent authority: At least 3 months.

Frist

There is no deadline.

Hinweise

  • Only the change is requested, the previous permission to cross a sidewalk is still valid.
  • The sidewalk crossing must not be modified yourself, for example with wooden beams, steel ramps or similar. This is an unauthorized intervention in the street space and this can be punishable.
  • Permission to change a sidewalk crossing does not replace other necessary official permits or result in claims, for example for the construction of a garage or carport.

Rechtsbehelf

  • contradiction
  • Further information on how to file an objection can be found in the notification of your application
  • Complaint before the administrative court

Kurztext

  • Consent is required to change a sidewalk crossing
  • Work to alter a sidewalk crossing will be completed
    • commissioned by the competent authority
    • or carried out by an approved company (exceptional case)

Ansprechpunkt

nicht vorhanden

Zuständige Stelle

Authority for Transport and Mobility Turnaround

Formulare

nicht vorhanden