Abwasseranlagen Anzeige

Hamburg 99129015169000 Typ 2/3

Inhalt

Leistungsschlüssel

99129015169000

Leistungsbezeichnung

<div lang="en-x-mtfrom-de">Waste water treatment display</div>

Leistungsbezeichnung II

<div lang="en-x-mtfrom-de">Indicate a change in the location, condition or operation of a wastewater treatment plant</div>

Leistungstypisierung

Typ 2/3

Begriffe im Kontext

<div lang="en-x-mtfrom-de">Waste water disposal</div> (Synonym), <div lang="en-x-mtfrom-de">Waste water drainage</div> (Synonym), <div lang="en-x-mtfrom-de">Indirect introduction</div> (Synonym), <div lang="en-x-mtfrom-de">Indirect discharger</div> (Synonym), <div lang="en-x-mtfrom-de">Section 60 Annex</div> (Synonym), <div lang="en-x-mtfrom-de">combined sewer system</div> (Synonym), <div lang="en-x-mtfrom-de">precipitation water discharge</div> (Synonym), <div lang="en-x-mtfrom-de">dirty water</div> (Synonym), <div lang="en-x-mtfrom-de">Water Management Act</div> (Synonym)

Leistungstyp

nicht vorhanden

SDG Informationsbereiche

nicht vorhanden

Lagen Portalverbund

nicht vorhanden

Einheitlicher Ansprechpartner

Nein

Fachlich freigegeben am

11.08.2022

Fachlich freigegeben durch

nicht vorhanden

Handlungsgrundlage

§ 60 paragraph 4 Water Resources Act (WHG)
www.gesetze-im-internet.de/whg_2009/__60.html
§§ 2-6 Industrial Wastewater Treatment Plant Approval and Monitoring Ordinance (IZÜV)
www.gesetze-im-internet.de/iz_v/BJNR101100013.html
Appendix 1, Section 4.10.2 Environmental Fee Regulations (UmwGebO)
www.landesrecht-hamburg.de/bsha/document/jlr-UmwGebOHAV39Appendix1

Teaser

You must notify the responsible authority under certain conditions of any change in the location, condition or operation of a wastewater treatment plant.

Volltext

If you want to make a change to your wastewater treatment system, which ones
  • the location, condition or operation of your facility and
  • does not require approval and
  • can have an impact on the environment
then you must report this proposed change to the responsible authority in advance.

Erforderliche Unterlagen

Documents must be submitted that demonstrate the nature, scope and effects of the intended change. The specific documents required depend on the type of system and the type of wastewater that is handled in the system. It is therefore recommended that you contact the responsible office in advance and ask for the documents required in your specific case.

Voraussetzungen

  • You must build, operate and maintain wastewater systems in such a way that the requirements for wastewater disposal are met.
  • Wastewater treatment plants that require approval must be built, operated and maintained by you in accordance with the state of the art.

Kosten

Gebühr: 160€ - 15.000€
160 EUR - 15,000 EUR

Verfahrensablauf

  • It is recommended that you contact the responsible authority in advance to determine whether your project requires notification or approval. The responsible office can also provide you with the necessary documents.
  • You submit your report together with the necessary documents to the responsible authority.
  • The responsible authority will check your ad for completeness and whether it may require approval and, if necessary, request any missing documents from you.
  • The result of the test will be communicated to you.

Bearbeitungsdauer

The processing time depends on the quality and scope of the applications and documents submitted.

Frist

At least one month before the change is to start.

Hinweise

The obligation to report applies to independently operated industrial wastewater treatment plants that are not ancillary facilities within the meaning of Section 1 Paragraph 2 No. 2 of the 4th BImSchV. Furthermore, the wastewater must come from one or more plants in accordance with the Industrial Emissions Directive (IE-RL) and not fall under the Municipal Wastewater Directive (91/271/EEC).

An existing water permit or indirect discharger permit may also need to be adjusted following changes to the system.

Rechtsbehelf

Objections to the decision can be filed within one month of notification.

Kurztext

  • Indicate a change in the location, condition or operation of a wastewater treatment plant
  • Any proposed changes must be displayed in advance
    • relate to the location, nature or operation of a facility and
    • do not require approval and
    • can have an impact on the environment

Ansprechpunkt

nicht vorhanden

Zuständige Stelle

Authority for the Environment, Climate, Energy and Agriculture

Formulare