Teilgenehmigung zur Errichtung einer Anlage nach BImSchG Erteilung

Hamburg 99063012001000 Typ 2

Inhalt

Leistungsschlüssel

99063012001000

Leistungsbezeichnung

<div lang="en-x-mtfrom-de">Partial approval for the construction of a system according to the BImSchG</div>

Leistungsbezeichnung II

<div lang="en-x-mtfrom-de">Apply for a partial permit to construct and operate a facility requiring a permit</div>

Leistungstypisierung

Typ 2

Begriffe im Kontext

<div lang="en-x-mtfrom-de">Federal Immission Control Act, permits</div> (Synonym), <div lang="en-x-mtfrom-de">units</div> (Synonym), <div lang="en-x-mtfrom-de">plant parts</div> (Synonym)

Leistungstyp

nicht vorhanden

SDG Informationsbereiche

nicht vorhanden

Lagen Portalverbund

nicht vorhanden

Einheitlicher Ansprechpartner

Nein

Fachlich freigegeben am

18.12.2023

Fachlich freigegeben durch

nicht vorhanden

Handlungsgrundlage

§ 8 Federal Immission Control Act (BImSchG)
URL: https://www.gesetze-im-internet.de/bimschg/__8.html

§ 10 Federal Immission Control Act (BImSchG)
URL: https://www.gesetze-im-internet.de/bimschg/__10.html

§§ 5 - 7 Federal Immission Control Act (BImSchG)
URL: https://www.gesetze-im-internet.de/bimschg/BJNR007210974.html#BJNR007210974BJNG000303360

Teaser

If you want to set up or operate a part of the plant that can damage the environment to a particular extent or endanger the general public, you need a partial permit.

Volltext

Parts of installations may, due to their nature or operation, cause harmful environmental impacts or otherwise endanger, significantly disadvantage or annoy the general public or the neighbourhood.
If you want to build or operate a facility, you need a partial permit from the responsible authority.

Erforderliche Unterlagen

  • written or electronic application
  • Drawings, plans and reports required to check the approval requirements
  • Explanations
  • If required, you will receive information on further documents from the responsible authority
For the approval of installations under the Industrial Emissions Directive in which relevant hazardous substances are used, produced or released, if and to the extent that contamination of the soil or groundwater on the installation site by the relevant hazardous substances is possible:
  • Report on the initial status
There is no possibility of soil or groundwater contamination if the actual circumstances make it possible to exclude such contamination.

Voraussetzungen

  • You can apply for and be granted a partial permit if the full permit for an application has not yet been granted, but the following conditions are met:
  1. there is a legitimate interest in granting a partial authorisation,
  2. the approval requirements for the subject matter of the partial approval requested are met and
  3. A preliminary assessment shows that there are no a priori insurmountable obstacles to the construction and operation of the entire plant with regard to the authorisation requirements.
  • The sub-project meets the requirements of the Federal Immission Control Act.
  • The sub-project does not conflict with any other public law regulations or occupational health and safety concerns.
  • A preliminary assessment has shown that there are no a priori insurmountable obstacles to the construction and operation of the entire plant with regard to the authorisation.
  • The preliminary overall assessment is no longer binding if the factual or legal situation or individual assessments change in the context of subsequent partial approvals and the assessment changes as a result. In this case, the responsible office can refuse approval or further partial approvals.

Kosten

Fees apply. The amount of the fees depends on the investment amount or the administrative costs. They are determined based on the Hamburg Environmental Fees Ordinance.

Verfahrensablauf

You submit the application for approval for the construction and operation of facilities requiring approval to the competent authority in writing or electronically.

The responsible authority will examine your application.
If necessary, the responsible authority will request further information or documents from you.

The competent authority shall publish the application and the relevant documents and make it available for public inspection for one month.
The competent authority shall request the authorities involved to comment on the authorisation procedure within one month.
Objections will be discussed with you and those who raised the objections at a public hearing.
In a simplified approval procedure or if public participation is waived, there will be no public interpretation or discussion.

The responsible authority will decide on your application. If necessary, the responsible authority will supplement the decision with content and additional provisions.
You will receive a written notice with reasons.
Those who have raised objections will also receive the decision with reasons.

Bearbeitungsdauer

The competent authority will decide on your application within 7 months or 3 months after all necessary documentation has been received, depending on whether public participation is required or not.

Frist

You need approval before you set up or operate the part of the plant or the sub-plants.

Hinweise

no

Rechtsbehelf

  • Objection
  • Action before the administrative court

Kurztext

  • Apply for a partial permit to construct and operate a facility requiring a permit
  • Installations requiring approval are, due to their nature or operation, particularly likely to cause harmful environmental impacts or to endanger, significantly disadvantage or significantly nuisance the general public or neighbourhood
  • Authorisation for the construction and operation of part of a plant
  • Approval of the entire system is granted after preliminary assessment by the competent authority

Ansprechpunkt

nicht vorhanden

Zuständige Stelle

Authority for the Environment, Climate, Energy and Agriculture