Anzeige der Errichtung, wesentliche Änderung oder Stilllegung einer Jauche-, Gülle- und Silagesickersaftanlage nach Anlage 7 AwSV
Inhalt
<div lang="en-x-mtfrom-de">Notification of the construction, significant change or closure of a liquid manure, liquid manure and silage leachate plant according to Annex 7 AwSV</div>
<div lang="en-x-mtfrom-de">Show liquid manure, liquid manure or silage leachate system (JGS system).</div>
Begriffe im Kontext
<div lang="en-x-mtfrom-de">Water protection areas</div> (Synonym), <div lang="en-x-mtfrom-de">Water protection</div> (Synonym), <div lang="en-x-mtfrom-de">AwSV</div> (Synonym), <div lang="en-x-mtfrom-de">Walling</div> (Synonym), <div lang="en-x-mtfrom-de">silage</div> (Synonym), <div lang="en-x-mtfrom-de">Damn</div> (Synonym), <div lang="en-x-mtfrom-de">silo</div> (Synonym), <div lang="en-x-mtfrom-de">collection pit</div> (Synonym)
Fachlich freigegeben am
20.10.2023
Fachlich freigegeben durch
nicht vorhanden
If you want to build, shut down or make significant changes to a manure, liquid manure and silage seepage plant (JGS plant), you must notify the responsible authority in advance.
Manure, slurry and silage seepage systems (JGS systems) are systems for dealing with water-polluting substances, such as storing and filling these substances. The manure, slurry and silage seepage systems include, among other things, containers, collection pits, solid manure storage, silos, slurry cellars and slurry channels, filling areas with the associated pipelines and their safety devices.
If you have a
If you have a
- System for storing silage leachate with a volume of more than 25 cubic meters,
- other manure, slurry and silage seepage plant with a total volume of more than 500 cubic meters
- System for storing solid manure or silage with a volume of more than 1,000 cubic meters
The costs for the official examination of the advertisement are 75 - 1,500 EUR, depending on the type and scope of the advertisement.
- You report the change of ownership in writing to the responsible authority or use the online service.
- The responsible authority will check your report and, if necessary, request any missing information or documents.
- Your report will be saved with the responsible authority.
- Show construction, significant modification or closure of a manure, slurry or silage seepage plant (JGS plant).
- The construction, significant modification or closure of a JGS system must be reported to the responsible authority
- The construction, modification or closure of are subject to notification
- Systems for storing silage leachate with a volume of more than 25 m³
- Other manure, slurry or silage seepage systems with a total volume of more than 500 m³
- Systems for storing solid manure or silage with a volume of more than 1,000 m³