Dies ist die interne Entwicklungsumgebung des FIM Portals. Bitte nutzen Sie die produktive Umgebung.

Abgeschlossenheitsbescheinigung Ausstellung

Hamburg 99012002012000 Typ 4

Inhalt

Leistungsschlüssel

99012002012000

Leistungsbezeichnung

<div lang="en-x-mtfrom-de">Certificate of completion issuance</div>

Leistungsbezeichnung II

<div lang="en-x-mtfrom-de">Apply for a certificate of completion</div>

Leistungstypisierung

Typ 4

Begriffe im Kontext

<div lang="en-x-mtfrom-de">Certificate of completion - already applied for</div> (Synonym), <div lang="en-x-mtfrom-de">Allocation plan</div> (Synonym), <div lang="en-x-mtfrom-de">Construction matters</div> (Synonym)

Leistungstyp

nicht vorhanden

SDG Informationsbereiche

nicht vorhanden

Lagen Portalverbund

nicht vorhanden

Einheitlicher Ansprechpartner

Nein

Fachlich freigegeben am

06.06.2024

Fachlich freigegeben durch

nicht vorhanden

Handlungsgrundlage

Section 7 paragraph 4 sentence 1 number 2 German Condominium Act (WEG)
www.gesetze-im-internet.de/woeigg/__7.html
Section 32 paragraph 1, paragraph 2 sentence 2 number 2 German Condominium Act (WEG)
www.gesetze-im-internet.de/woeigg/__32.html
General administrative regulation for the issuing of certificates under the Condominium Act (AVA)
www.verwaltungsvorschriften-im-internet.de/bsvwvbund_06072021_SW35.htm

Teaser

If you need to prove that an apartment or other space is self-contained, you will need a certificate of self-containedness.

Volltext

If you want to divide a property into individual, legally separate rooms (e.g. residential units), you need a so-called certificate of completion. You must apply for the certificate of completion from the responsible authority.

With the certificate of completeness, the responsible authority certifies that a room is structurally sufficiently separated from other rooms. The certificate is required, for example, in order to divide an apartment building into several condominiums and then sell it. The certificate of completeness is also necessary for the entry of the ownership shares in the land register.

A self-contained space may include additional lockable rooms outside the respective enclosure (for example, storage rooms in the basement, parking spaces and parts of the property outside the building such as terraces and garden areas).

Erforderliche Unterlagen

  • Distribution plans (2x)
  • If applicable: existing notifications or notices
The documents must correspond to the approved building plans of the last building permit.

Voraussetzungen

  • You must prove that you are either the owner of the premises or have a building lease. Alternatively, you must provide evidence of your legitimate interest (e.g. purchase).
  • You must prove that the premises are self-contained. This is the case if
    • the premises are structurally separated from other rooms, for example by walls and ceilings, and
    • they have their own lockable access directly from the outside, from a staircase or an anteroom
  • Parking spaces and parts of the property outside the building (terraces and garden areas) must be clearly identified by dimensions in the construction drawing or in the division plan.

Kosten

Gebühr: 9€ - 400€
33.42 EUR per usage unit new
133.69 EUR per unit of use
8.32 EUR per garage parking space

At least EUR 66.84 per application
In case of on-site inspection, an additional charge of up to EUR 400.00

Verfahrensablauf

  • You submit an informal, written application together with the necessary documents to the responsible authority.
  • The responsible authority will examine your application and, if necessary, request any missing documents or information from you.
  • If all requirements are met, you will receive a written certificate.

Bearbeitungsdauer

You must expect processing to take up to several months.

Frist

No

Hinweise

Telephone advice is no longer available. Advice outside of ongoing approval procedures is subject to a fee.

Rechtsbehelf

Administrative court action

Kurztext

  • Apply for a certificate of completion
  • Certificate of completion required when dividing real estate into legally separate premises (e.g. apartments)
  • Application for a certificate of completion is required from the relevant office
  • The office certifies the structural separation of a room from other rooms
  • Lockable rooms outside the respective enclosure can belong to a self-contained space (storage rooms in the basement, parking spaces, terraces, garden areas)

Ansprechpunkt

If you want to find out exactly who is responsible for your request, please follow the link to Authority finder Hamburg

Zuständige Stelle

District Office Bergedorf

Formulare

nicht vorhanden