Beseitigung von Denkmalen Genehmigung
Inhalt
Begriffe im Kontext
- Erlangung von Lizenzen, Genehmigungen oder Zulassungen im Hinblick auf die Gründung und Führung eines Unternehmens
Fachlich freigegeben am
Fachlich freigegeben durch
If, by way of exception, you want to remove or demolish monuments in whole or in part, a permit from the lower monument protection authority is required.
This checks in advance whether demolition is absolutely necessary or whether the implementation of measures necessary for preservation is reasonable and to what extent features justifying the monument status can still be essentially preserved.
If you are planning measures requiring building permit in accordance with the Brandenburg Building Code, the lower monument protection authority will be involved in the building permit procedure via the building supervisory office. In this case, the building permit automatically includes a change permit from the competent monument protection authority.
Each measure shall be described in detail. You should submit all documents that contribute as fully as possible to the assessment of your project. These can be:
- Plans (e.g. location, floor plans, views, sectional representations)
- Documentation
- Photographs
- Expert opinions or preliminary investigations
- Cost and profitability calculations
Note: Contact the lower monument protection authority in good time. This will inform you which documents are required for your approval procedure.
You will only receive approval in certain exceptional cases or as a case-by-case decision.
Examples:
- particularly poor state of preservation / acute danger of collapse
- little or no original substance is preserved after renovation or restoration ("copy")
- serious other private or public interests (e.g. safety for life and health)
- Fill out the application either online or print out the PDF form.
- Attach all necessary documents.
- Submit the application documents to the responsible lower monument protection authority in good time before the start of the planned measures.
- You will then receive approval or, if applicable, information about the rejection of your application by post.
Expiry of the authorisation
- if construction does not start: 4 years after approval
- in the event of a construction interruption of more than 2 years
(one-time extension of up to 2 years upon written request)
- Removal of monuments Permit
- only possible in exceptional cases
- Prior examination by lower monument protection authority necessary
- Application with documents required (except for building permit application)
- no costs
- Processing time approx. 4 weeks
- responsible: lower monument protection authorities of the districts and independent cities
In the state of Brandenburg, the lower monument protection authority of the districts and independent cities is responsible
Forms: Application
Online procedure possible: partially
Written form required: partial
Personal appearance required: no