Gewährleistung der Betriebssicherheit - Erlaubnis zur Errichtung und zum Betrieb von Anlagen mit Druckgeräten beantragen
Inhalt
Begriffe im Kontext
- Gesundheits- und Sicherheitsvorschriften im Zusammenhang mit verschiedenen Arten von Tätigkeiten, einschließlich der Risikovermeidung, Information und Ausbildung
Fachlich freigegeben am
Fachlich freigegeben durch
If you want to build, operate or make certain changes to a filling system for compressed gases, you need a permit from the competent authority.
Filling systems with pressure equipment in which transportable pressure equipment is filled with a filling capacity of more than 10 kilograms per hour for delivery to others are systems requiring monitoring.
You will need a permit from the relevant authority if you are using a filling system:
- want to build and put into operation, or
- want to change the design or mode of operation in such a way that the safety of the system is affected.
Permission can be granted to you subject to the following restrictions:
- limited
- temporary
- under conditions, or
- with conditions.
If the installation requiring a permit is part of an installation requiring a permit, no separate permit will be issued. The permit includes the permission.
Informal application with the following information:
- Last name, first name, company name
- Address of the applicant
- Contact information (e-mail, telephone, fax)
- Type of permission:
- Construction and operation
- Modification and operation
- Partial permission
- Indication of the place of operation
Documents to be able to assess the plant:
- Subject matter of the application
- Description of the plant
- Safety equipment for toxic gases
- Safety equipment for flammable gases
- Description of the plant technology and interaction with other plants
- Piping and instrumentation flow diagram (P&ID diagram)
- Safety Data Sheets
- Description of the mode of operation
- Lay-out
- Site plan
- Floor plan/technical plan
- ExZone Plan
- Explosion protection concept
- Information on fire protection
- Calculation of production costs
- Other installations
- Test report of an approved inspection body (ZÜS)
- The test report must confirm that the system can be operated safely if the above measures are observed.
- The plant for which you are applying for the permit must be an installation requiring a permit.
- They must build and operate state-of-the-art filling systems.
- Your documentation must be complete, plausible and meaningful.
- The test report of the approved inspection body (ZÜS) must confirm that the requested installation can be operated safely if the measures specified in the documents, including the tests, are complied with.
- Submit the application for permission for the installation requiring monitoring to the competent authority with the necessary documents, including the test report of the approved inspection body (ZÜS).
- If there is a permit requirement under the Federal Immission Control Act, you will receive the application documents back, as a permit under the Industrial Safety Ordinance will then be checked as part of the necessary permit under the Federal Immission Control Act.
- The competent authority shall take its decision after examination and inform you thereof.
The permit expires if:
- you have not started the construction of the installation within two years of the permit being granted,
- you have interrupted the construction of the installation for two years or more, or
- You have not operated the system for a period of three years.
For important reasons, you can apply to the licensing authority for an extension of the deadlines.
Contradiction:
- You may appeal against the decision within one month of notification.
- You must submit the objection to the competent authority in writing or for a record.
- Construction and operation of a plant requiring monitoring in accordance with the Industrial Safety Ordinance Approval of plants with pressure equipment
- Permission is required for the construction, operation or modification of the design and operation of filling systems for compressed gases (systems with pressure equipment) with a filling capacity of more than 10 kilograms per hour into transportable pressure equipment for delivery to other filling systems are so-called "systems requiring monitoring" which must be assembled, installed and operated according to the state of the art.
- The permit can:
- granted subject to conditions,
- limited
- for a limited period of time and
- be subject to conditions.
- Application: informally in writing or electronically
- An application for partial permission is possible.
- responsible: Occupational health and safety authority or trade supervisory authority
Forms available: No
Written form required: Yes
Informal application possible: Yes
Personal appearance required: No
Online services available: No