Anzeige von Anlagen zum Umgang mit wassergefährdenden Stoffen, Eignungsfeststellung beantragen
Inhalt
Begriffe im Kontext
- Erlangung von Lizenzen, Genehmigungen oder Zulassungen im Hinblick auf die Gründung und Führung eines Unternehmens
- Erlaubnisse und Genehmigungen (2010400)
- Tier-, Pflanzen- und Naturschutz (2130200)
- Anlagenbetrieb und -prüfung (2120100)
Fachlich freigegeben am
Fachlich freigegeben durch
The construction of a facility for handling substances hazardous to water, you must notify the competent authority under certain conditions.
If you want to set up or significantly change a facility for handling substances hazardous to water, this may require notification under water law or a suitability determination.
- completed notification form
- detailed documents describing the project (site plan, drawings, proofs, descriptions)
- if necessary, expert opinion
- The facilities must comply with the requirements of the Ordinance on Facilities for Handling Substances Hazardous to Water (AwSV). This must be proven with the documents to be submitted.
- If the notified facilities require a suitability determination, corresponding evidence, such as an expert opinion, must be submitted.
The amount of the fee is determined by the Thuringian administrative cost regulations for the business area of the Ministry for the Environment, Energy and Nature Conservation. The fee amount depends on the type of plant and the associated inspection effort. The fee range extends from €60 to €2,500.
- The project sponsor must give at least six weeks' advance notice of the construction or substantial modification of a facility for handling substances hazardous to water.
- If a facility requires a suitability determination, construction may only take place after the determination has been issued.
- The water authority examines the documents. It may temporarily or permanently prohibit the project or issue a notice with conditions.
- The processing of a complaint takes on average one month.
- If the documents are complete,
- no other procedure such as a suitability determination or exemption in the water protection or flood area results from it, and
- no conditions are imposed by the water authority in the form of a decision,
- the project can be carried out after the expiry of the six-week period (fictitious approval).
- If the project is the subject of another procedure, e.g. according to the Federal Immission Control Act, the notification according to § 40 AwSV does not apply if the project is examined within the framework of the other procedure. In this case, the six-week period does not apply.
- The developer must give at least six weeks' notice of the construction or substantial modification.
- If an installation requires a suitability determination, construction may only take place after this has been granted.
- Suitability of facilities for handling substances hazardous to water Determination
- The construction or substantial modification of facilities for handling substances hazardous to water, may be subject to notification or require a suitability determination.
- Prerequisites:
- The facilities must comply with the requirements of the Ordinance on Facilities for Handling Substances Hazardous to Water (AwSV). This must be proven with the documents to be submitted.
- If the notified facilities require a suitability determination, corresponding evidence, such as an expert opinion, must be submitted.
- Fees will be charged.
- Responsible: Lower water authority at the locally responsible district office or the locally responsible independent city.
The lower water authorities at the locally responsible district office or the locally responsible independent city are responsible.
Forms/online services available: Yes
Written form required: No
Informal application possible: Yes