Deponie Feststellung der endgültigen Stilllegung beantragen
Inhalt
Begriffe im Kontext
- Erlangung von Lizenzen, Genehmigungen oder Zulassungen im Hinblick auf die Gründung und Führung eines Unternehmens
Fachlich freigegeben am
Fachlich freigegeben durch
If you have carried out all the necessary measures during the closure phase of the landfill or landfill section, apply to the competent authority for a determination of final closure.
After carrying out the necessary measures for the construction of a surface sealing system as well as the recultivation, you apply to the competent authority for the determination of the final closure. This determination is made by way of an acceptance of the landfill or individual landfill sections as well as the associated technical equipment.
- at least evaluative summaries of the annual reports according to § 13 Paragraph 5 DepV and the as-built plans according to § 13 Paragraph 6 DepV
- certificates issued by the supervisory authority responsible at the time of construction or equivalent evidence of the proper construction of the surface sealing system
- In the decommissioning phase you have carried out all the necessary measures
- You have attached the required documents to the application
You have already notified the competent authority of the intended closure of a landfill or a section of a landfill, and have carried out the necessary measures to establish a surface sealing system. Recultivation has also been completed. Now you apply to the competent authority for a determination of final closure. Your application will be reviewed and an acceptance of the landfill or individual landfill sections and the associated technical equipment will be initiated. Subsequently, the date of final closure and further requirements regarding the aftercare phase will be determined. The decision of the authority will be sent to you.
- Landfill decommissioning
- Application for determination of final closure
- Requirements:
- You have carried out all necessary measures during the decommissioning phase
- You have attached the required documents to the application
- Required documents:
- at least evaluative summaries of the annual reports according to § 13 paragraph 5 DepV and the as-built plans according to § 13 paragraph 6 Dep V
- Certificates from the supervisory authority responsible at the time of construction or equivalent evidence of the proper construction of the surface sealing system
- Cost range: 100-1,000 euros
- Responsible: Thuringian State Office for the Environment, Mining and Nature Conservation