Fliegende Bauten: Aufstellung anzeigen
Inhalt
Begriffe im Kontext
- Erlangung von Lizenzen, Genehmigungen oder Zulassungen im Hinblick auf die Gründung und Führung eines Unternehmens
Fachlich freigegeben am
Fachlich freigegeben durch
You want to erect a temporary structure for an event. To do so, you must notify the lower building supervisory authority at the installation site.
If you wish to erect a temporary structure that requires a building permit for an event, you must notify the lower building supervisory authority at the place of erection.
Temporary structures are structures that are suitable and intended to be set up and dismantled repeatedly. Examples include merry-go-rounds, air swings, Ferris wheels, roller coasters and slides, grandstands, stalls, tents and structures for aerial performances, as well as stages and canopies for cabarets and concerts.
- Completed notification
- inspection book
- Site plan (in the development plan)
- If applicable, a declaration on the assumption of costs in the event of a necessary acceptance of use
- You must present a valid work permit. The execution permit is noted in the inspection logbook.
- Display: free of charge
- if an acceptance of use is necessary: the acceptance of use is subject to a charge. The specific cost framework can be found in the service description of the acceptance of use.
The building permit may stipulate that notification is not required because a risk to life and health is not to be expected.
If notification is required, submit the notification and other necessary documents to the lower building supervisory authority at the installation site.
The lower building supervisory authority will check the notification and may carry out an on-site inspection (acceptance of use) for a fee. The result of the inspection is entered in the inspection logbook. If a prohibition has been entered in the inspection book, you must restore the building to a proper condition. If this is not done within a reasonable time or if there is imminent danger, you may not put the temporary structure into operation. In this case, the lower building supervisory authority will decide whether to withdraw the inspection logbook.
If a temporary structure is to be erected in one place for longer than three months, a subsequent inspection may be carried out by the lower building supervisory authority.
- Temporary structures - Notification of erection Acceptance
- Notification possible via online form
- Inspection book must be submitted
- Responsible: lower building supervisory authority
- Forms/online services available: Yes
- Written form required: No
- Informal application possible: Yes
- Personal appearance necessary: No