Errichtung, wesentliche Änderung oder Maßnahmen mit Änderung der Gefährdungsstufe von Heizölverbraucheranlagen nach AwSV anzeigen
Inhalt
Begriffe im Kontext
Fachlich freigegeben am
Fachlich freigegeben durch
Landesbauordnung für Baden-Württemberg (LBO)
- § 49 Genehmigungspflichtige Vorhaben
Bundes-Immissionsschutzgesetz (BImSchG)
- §10 Genehmigungsverfahren
Verordnung über Anlagenzum Umgang mit wassergefährdenden Stoffen (AwSV)
- § 40 Anzeigepflicht
If you want to set up a new heating oil consumer system or make significant changes to it or take measures that result in a change in the hazard level, you must notify the authorities.
You must submit your notification of the construction, significant modification or change to the hazard level of a heating oil consumer system to the competent authority in good time beforehand.
Notification is not required if
- a suitability assessment has been applied for for this installation in accordance with the Water Resources Act or
- the installation is the subject of an authorisation procedure under other legislation, provided that the authorisation procedure also ensures compliance with the requirements of this Ordinance. This is generally the case for authorisations in accordance with the State Building Regulations for Baden-Württemberg or the Federal Immission Control Act.
- Completed notification form
- Detailed documents describing the project (site plan, drawings, certificates, descriptions)
- Expert opinion, if applicable
The systems must fulfil the requirements of the Ordinance on Systems for Handling Substances Hazardous to Water (AwSV). This must be verified with the documents to be submitted.
Fees are only due if the competent authority has to order additional measures. Fees are calculated on the basis of the legal ordinance and statutes of the relevant competent authority and the provisions of the Baden-Württemberg State Fees Act.
If you want to place the advert online:
- You submit the notification via the online service.
- The competent authority will check your documents for completeness and request any missing information or documents.
- The content requirements are also checked, which may also result in additional requirements.
- The authority can temporarily or definitively prohibit the project or issue a decision with conditions.
If you wish to submit the notification by letter or e-mail:
- You complete the forms required for the notification and send them to the competent authority.
- The further procedural steps correspond to the online procedure.
If you have any questions, please contact the responsible authority. You can also consult the map service of the Baden-Württemberg State Institute for the Environment for water or medicinal spring protection areas and flood areas. You can view flood hazard maps here.
You will receive confirmation of receipt of your notification. There is no right of appeal against the confirmation of receipt.