Energieversorgung - Genehmigung des Netzbetriebs (Land) beantragen
Inhalt
Begriffe im Kontext
Fachlich freigegeben am
Fachlich freigegeben durch
Energiewirtschaftsgesetz (EnWG):
- § 4 Genehmigung des Netzbetriebs
Gebührenverordnung Umweltministerium (GebVO UM):
- Nummer 14.1 der Anlage zu § 1 Leistungsbereichsbezogene Gebührentatbestände
Efficient and reliable energy supply networks are a prerequisite for supplying the general public with electricity and gas. The supply should meet the following requirements:
- secure
- reasonably priced
- consumer-friendly
- efficient
- environmentally compatible
Permission is required to start operating an energy supply network. A licence is required for each individual network. In the case of a distribution network, the spatial delimitation is determined by the respective concession area.
- Presentation of own company with details of shareholdings
- Articles of association (or statutes) and, if applicable, consortium agreement
- For proof of the legal form of the company:
- If you have your registered office in Germany:
- for registered companies: Excerpt from the commercial register
- for registered cooperatives: extract from the register of cooperatives
- If you have your company's registered office abroad, you will need documents from the country of domicile proving the legal form.
- If you have your registered office in Germany:
- Organisation chart with number of employees
- Nomination of the commercial and technical manager as well as his or her certificate of qualification and curriculum vitae
- Proof of compliance with the generally recognised rules of technology of the Verband der Elektrotechnik Elektronik Informationstechnik e.V. (Association for Electrical, Electronic & Information Technologies) or the Deutsche Vereinigung des Gas- und Wasserfaches e.V. (German Technical and Scientific Association for Gas and Water) (VDE-AR-N 4001 (S 1000) / DVGW worksheets G 1000 and G 1200 or G 1040), TSM confirmation if applicable
- Operation management contracts, if concluded
- Concession agreement (right of way agreement), if concluded
- Purchase or lease agreement for the grid, if concluded
- Description of risk management for network operation (fault monitoring and rectification)
- For proof of economic performance: current balance sheet and profit and loss account, profit transfer agreements and profitability calculations, if applicable
- For proof of implementation of the IT security catalog of the BNetzA (Section 110 (1) EnWG): ISMS certification
Prerequisites are:
- Electricity or gas supply network is located in Baden-Württemberg
- Sufficient personnel, technical and economic capacity and reliability of the operator
You must submit an informal application to the competent body containing information on the following points:
- Area of the energy supply network
- Is it a transmission or electricity distribution network?
- Is it a transmission or gas distribution network?
- Is it an energy supply network for the general supply of end consumers?
- Number of house connections
- Number of connections to generation plants
- Entry and exit points
- Provision for the procurement of balancing energy and energy for balancing services
- Measures to remedy disturbances
- economic capacity of the applicant
You will receive the decision in writing.
For further information, please contact the competent body.
Decision of the Ministry: within six months after submission of complete application documents