Bodenabbaugenehmigung
Inhalt
Begriffe im Kontext
nicht vorhanden
- Erlaubnisse und Genehmigungen (2010400)
- Tier-, Pflanzen- und Naturschutz (2130200)
Fachlich freigegeben am
nicht vorhanden
Fachlich freigegeben durch
nicht vorhanden
- Federal Mining Act (BBergG)
- Water Resources Act (WHG)
- Federal Immission Control Act (BImSchG)
- Hessian Building Code (HBO)
- Hessian Nature Conservation Act - HENatG)
The permit requirement for the extraction of mineral resources arises as follows:
- in the case of mineral resources under mining law from the Federal Mining Act (BBergG). The mineral resources under mining law are listed in § 3 paras. 3 and 4 BBergG.
- for all other mineral resources
- if a body of water is produced or substantially altered during mining from:
the Water Resources Act (WHG). - if dry degradation,
- the mining area is more than 10 ha in size or is blasted from the
Federal Immission Control Act (BImSchG), - the mining area is less than 10 ha in size and is not blasted from the
Hessian Building Code. According to this, the dismantling requires a building permit,
if the depth exceeds 2 meters or the excavation area in the built-up area
Indoor area is larger than 30 m² or outdoors larger than 300 m².
- the mining area is more than 10 ha in size or is blasted from the
- if a body of water is produced or substantially altered during mining from:
In all cases, as a rule, a nature conservation intervention permit is required in accordance with the Hessian Act on Nature Conservation and Landscape Management (Hessian Nature Conservation Act - HENatG).
Contact persons are the district committees or magistrates of the district-free cities as lower building authorities, in all other cases the regional councils as mining authorities or as upper water authorities or as immission control authorities.